PR from the SCADA sensor (MET-1)79.4%what the plant reports
PR after cleaning78.2%the real number
Hidden by sensor faults1.2 ptsPR looked better than it was
Monitoring classClass B4 changes to reach Class A

2 of 4 stations had problems during the year. MET-1, the sensor the plant uses for PR, had a dirty dome in May, a clock running an hour ahead from June to August and a 4-day outage in July, so the reported PR was 1.2 points too high. The plant itself had 2 real events: a trip and a week of curtailment.

What this could be costing you

Estimate
about ₹55.6 lakh a yearat stake from sensor errors and plant events
  • Your PR is reported 1.3 points too high. About 1,611 MWh a year of real underperformance (₹48.3 lakh) is hidden, so it can't be claimed under your PR guarantee.
  • Trips and curtailment found in your data lose about 244 MWh a year (₹7.3 lakh) at the rate seen.

Estimate: 98,171 MWh a year from your energy data × the PR error, plus energy lost in plant events, × ₹3/kWh. Use your own PPA tariff for a better figure.

Do the stations agree?

Every station is compared with the plant consensus (the median of all stations) day by day. When one walks away from the others under a clear sky, it's the sensor. Short disagreements are passing clouds and are left alone.

!MET-1✓MET-2!MET-3✓MET-4
0.920.961.001.04JanFebMarAprMayJunJulAugSepOctNovDec
MET-1MET-2MET-3MET-41.00 = agrees with the plant

Monitoring class

BClass

The station meets Class B. 4 changes reach Class A.

Checked from the data (recording interval, availability, station agreement) and the station details supplied (sensors, cleaning, calibration).

Product suggestions are independent recommendations; product names are trademarks of their owners.

PR Check: is it the plant, or the sensor?

Monthly PR

From MET-1, as loggedOff by more than 1 pointAfter cleaning
65%70%75%80%85%90%95%JanFebMarAprMay77%JunJul91%AugSepOctNovDec

May: MET-1's dome was dirty and read low, so PR looked better. July: MET-1 stopped logging for 4 days while the plant kept producing, so the reported PR jumped.

Power vs irradiance

Using MET-1 as logged025050075010000102030405060Irradiance, W/m²Power, MWClock 1 h off: loopsTrip: zero powerAfter SolarDoc cleaning025050075010000102030405060Irradiance, W/m²Power, MWClipping: flat topCurtailment

With the clock an hour off, mornings and afternoons split into two loops. After cleaning, the points fall on one line, so whatever stays off it is the plant: clipping at the inverter limit (flat top), curtailment, and a trip.

Real plant events

Statement for EPC and O&M performance reviews

The irradiance data used for PR was checked by SolarDoc against all 4 plant stations. After removing 3 sensor faults at MET-1, the 2024 PR is 78.2%, not 79.4%. The 2 events listed above are plant-side; the rest of the difference comes from the measurement.

Method

This sample uses a simulated plant. Automated analysis complements, not replaces, an independent engineer's review.