Plant Check
Upload your plant's power or energy export and all your weather station files. See which sensor is wrong, your monitoring class, and the PR your plant really made. Your files are analysed in your browser and never uploaded. Only the plant location is sent, to fetch satellite data.
1
Your plant
2
Add your files
No files handy?
What should my files look like? Download an example
Plant powerFrom inverters, SCADA or the plant controller. One column per inverter, or one for the whole plant.
Timestamp,Inverter 1 AC power (kW),…
2024-04-24 12:00,22852.3,…plant-power-template.csv ↓
Or: energy meterMeter readings (running total) or energy per interval. Use this if you don't have power.
Timestamp,Export meter reading (kWh)
2024-04-24 12:00,32791124energy-meter-template.csv ↓
Weather stationIrradiance from each pyranometer. Temperatures and wind are optional.
Timestamp,MET-1 POA irradiance (W/m2),…
2024-04-24 12:00,945,…weather-station-template.csv ↓
Several stations, one fileOne irradiance column per station. Separate files per station work too.
Timestamp,MET-2 POA…,MET-3 POA…
2024-04-24 12:00,950,944several-stations-template.csv ↓
- Time stamp first, in local time, at the end of each interval:
2024-04-24 12:00or24/04/2024 12:00. 1-minute to hourly data. - Unit in the column name:
(kW),(MW),(kWh),(W/m2). If it's missing, the unit is worked out from the plant size. - Say what each sensor measures:
POAfor in-plane (tilted) sensors,GHIfor horizontal ones, and start with the station name, e.g.MET-1 POA. - Any layout works: comma or semicolon, extra header lines, one file per month. Excel files: File → Save as → CSV. If a column isn't recognised, you can set it after uploading.
3
Station details
For the monitoring class check. Sensor counts and the recording interval are read from your files.